Filter : 
                    
                      
                      
                    
                    
                      
                      
                    
                    
                      
                      
                    
                    
                      
                      
                    
                  
                  | Standard and/or project under the direct responsibility of ISO/TC 192 Secretariat | Stage | ICS | 
|---|---|---|
| 
                           Gas turbines — Acceptance tests 
                           | 
                        95.99 | |
| 
                           Gas turbines — Acceptance tests 
                           | 
                        95.99 | |
| 
                           Gas turbines — Acceptance tests — Amendment 1: for combined-cycle power plants 
                           | 
                        95.99 | |
| 
                           Gas turbines — Acceptance tests — Technical Corrigendum 1 
                           | 
                        95.99 | |
| 
                           Gas turbines — Acceptance tests 
                           | 
                        90.92 | |
| 
                           Gas turbines — Acceptance tests 
                           | 
                        20.00 | 
                           | 
                      
| 
                           Gas turbines — Procurement — Part 1: General introduction and definitions 
                           | 
                        90.93 | |
| 
                           Gas turbines — Procurement — Part 2: Standard reference conditions and ratings 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement — Part 2: Standard reference conditions and ratings 
                           | 
                        60.60 | |
| 
                           Gas turbines — Procurement — Part 3: Design requirements 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement — Part 3: Design requirements 
                           | 
                        90.60 | |
| 
                           Gas turbines — Procurement — Part 4: Fuels and environment 
                           | 
                        90.93 | |
| 
                           Gas turbines — Procurement — Part 5: Applications for petroleum and natural gas industries 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement — Part 7: Technical information 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement — Part 8: Inspection, testing, installation and commissioning 
                           | 
                        90.60 | |
| 
                           Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement — Part 9: Reliability, availability and maintainability 
                           | 
                        60.60 | |
| 
                           Gas turbines — Procurement 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement 
                           | 
                        95.99 | |
| 
                           Gas turbines — Procurement — Amendment 1 
                           | 
                        95.99 | |
| 
                           Gas turbines and gas turbine sets — Measurement of emitted airborne noise — Engineering/survey method 
                           | 
                        95.99 | |
| 
                           Turbines and turbine sets — Measurement of emitted airborne noise — Engineering/survey method 
                           | 
                        90.93 | |
| 
                           Gas turbines — Exhaust gas emission — Part 1: Measurement and evaluation 
                           | 
                        90.60 | |
| 
                           Gas turbines — Exhaust gas emission — Part 2: Automated emission monitoring 
                           | 
                        90.60 | |
| 
                           Gas turbines — Vocabulary 
                           | 
                        90.93 | |
| 
                           Gas turbine combined cycle power plants — Thermal performance tests 
                           | 
                        90.92 | |
| 
                           Gas turbine combined cycle power plants — Thermal performance tests 
                           | 
                        10.99 | 
                           | 
                      
| 
                           Microturbines applications — Safety 
                           | 
                        90.93 | |
| 
                           Gas turbine applications — Requirements for power generation 
                           | 
                        90.93 | |
| 
                           Gas turbines — Data acquisition and trend monitoring system requirements for gas turbine installations 
                           | 
                        90.93 | |
| 
                           Gas turbine applications — Safety 
                           | 
                        95.99 | |
| 
                           Gas turbine applications — Safety 
                           | 
                        60.60 | |
| 
                           Gas turbine exhaust systems with or without waste heat recovery 
                           | 
                        90.20 | |
| 
                           Cogeneration systems  — Technical declarations for planning, evaluation and procurement 
                           | 
                        90.93 | 
No matching records found. Please try changing the filter settings.